Well we’re just about at the point where we builders were expecting to hand over the building to us – and although it’s not 100% done, really now it’s all about finishing touches and details – then getting approval from the building inspectors, and then getting power, phone and internet connected. We’re hopeful that we will be able to start moving furniture etc in after Xmas and be up and running in the first week of the New Year! Meanwhile, here are some pictures of the last major item to go in… Read More →
Work continues on fitting out the interior of the building – and also on the landscaping outside… When I went to the site this morning, the guys were starting to install the light fittings, and also finishing off the steps on the front porch. And we now have palm trees around the parking lot, and cacti! Individually these are all small things, but they each take us closer to being able to move in… Read More →
Well its now mid-November and it feels like just yesterday that I was watching the bulldozer make the first cut into the bush to start the building process. Now the building is essentially finished and we are in that “home stretch” with everyone pulling to have things finished by Dec 20th 2009. All that is left to do are lights, the stairs and the exterior areas. Read More →
The summertime always zips by so quickly and I cannot believe it’s been almost exactly a month since our last update. With the prospect of our green studio being ready at Christmas – we are basically only two months away from being “in” – woo hoo !! “Inconceivable!” Projetech have been on the ball as always and have been relentlessly pushing to get things done on time and seem to be maintaining their “month ahead of schedule” projection for completion. Read More →
OK – so it was my 2.56 minutes of fame. Hardly oprah and I errr, didn’t errr realise errr howmuch I say ERRR !!!! Anyway it was fun – the interviewer was Allison Capron who is Miss TCI Earth and I did a photoshoot with her a couple of months back so she was getting her ‘revenge”!! Read More →
Well I didn’t know this morning that I was going to be on TV, but a quick call from WIV and I was standing in front of our new studio at noon, in the bright sunshine giving a quick interview on our greenbuild building for this evening’s news!! It was at least 110F in the sun, but luckily it didn’t take long and the questions were more “desert island disks” than “question time” so I hope no “gaffs”!! Read More →
It’s been a couple of weeks since the last post – so time for a progress report. We are still ahead of schedule and the progress that Projetech and their team are making looks great. All the windows are in and green bits are starting to all come together too!! Very exciting! Read More →
The headline says it all really – progress! Our Turks and Caicos green build studio is coming along nicely and we are starting to see some of the “green” elements come into action. It’s been about a month since I was on-site and the change is dramatic. It really is starting to look like a studio now and it’s getting more and more exciting. Read More →
On my way to work this morning, I noticed that towering over the building site for the new studio was a large mobile crane… Sure enough, this signaled that the roof trusses were being raised into position, the first stage of building the roof. Luckily I had the Canon 5D Mk2 in the car with me so I was able to shoot some stills and video as the Projetech guys began to hoist the prefabricated trusses into position… Read More →
Although I drive by the construction site every day on my way to and from work, I haven’t had a chance in the last couple of weeks to go on-site and see how things were going; until today… basically they are going great! Building the blockwork for the walls was always going to be the part of the build that shows the most dramatic results in a fairly short time, but even so it’s impressive how things have come on in the last couple of weeks… Read More →