What a difference a week makes.

The site of the new greenbuild studio is on my drive to work (all 8 mins of it!) and out of the corner of my eye as I have been driving along I’ve seen the progress this week as the concrete block has arrived and some pipes and rebar seemingly are popping up above the building hoarding. However, nothing prepared me for the progress the Projetech team had made when I visited the site yesterday afternoon.

These pictures are exactly one week after the last post. It’s amazing to see what they have done – it’s just like being on the site of an “extreme makeover” !! It’s also amazing to start to see the rooms take shape and visualize actually being in them…wow!

tcbild_0001

tcbild_0002

The front door !

tcbild_0003

Here I am standing at the bottom of the stairs that will go up and to the left to the second floor.

tcbild_0004

This is the main open-plan office space downstairs looking from the reception area.

tcbild_0005

This where the main corridor will run from the office space down towards the studio.

tcbild_0007

The view from the main office area outside.

tcbild_0008

A very exciting storage area and computer/server area ;-)

tcbild_0009

A much more exciting showroom – it’s small, but awesome that we’ll have a space just to show our clients their great pictures.

tcbild_0010

I’m no standing outside the building looking at the back of the kitchen. Kitchen door on the right and the showroom across the corridor at the back.

tcbild_0011

The studio space with nice big doors and windows to let light in. It’s north-facing.

tcbild_0012

Can’t imagine what this is going to look like with another level built on top!

tcbild_0013

OK – had to be a little arty !

tcbild_0014

A view from on top of the on-site construction huts. Projetech have really kept the site clean and minimized the removal of local vegetation.

tcbild_0015

You can see the main resorts on Grace Bay in the distance. With the wide angle lens they look miles away, but in fact we can be at the seven stars resort from here in about 2-3 minutes. Really excited about the possibility of doing that journey in an electric car!

tcbild_0016

Another little arty shot!

tcbild_0017

Proof of a good construction crew -  a clean and tidy build site.

Also the block is really well put together – very clean, not much waste – I’ve seen bad block construction on other sites over the years.

tcbild_0019

tcbild_0020

So exciting times, things are really moving along. Projetech and Reliable Construction are doing a great job. I’m also getting emails from Tim at Construction Advisory Services and Ron Shaw at Ron Shaw Artichects about the next few decisions – i.e. door fittings, lighting, the roof – it’s great!

Similar Posts:

Post to Twitter Tweet This Post

One Response to “What a difference a week makes.”

  1. Tim says:

    Andy,

    what was that comment about the building not being complete until January..?

    might need a little wager!

Leave a Reply

You must be logged in to post a
video comment.