Inside and out progress report!

It’s been a couple of weeks since the last post – so time for a progress report. We are still ahead of schedule and the progress that Projetech and their team are making looks great.

All the windows are in and green bits are starting to all come together too!! Very exciting!

Here – not very exciting, but it is VERY GREEN  – literally! The green “box” is a klargester biodisc sewage treatment plant – so we can treat all our sewage on site. Not very unusual for the TCI as there is no centralized treatment plant, but it is unusual for the USA or UK. Next to it the yellow tanks are the in-line chlorinator and a 1500 gallon grey water irrigation tank for the plants. This should mean that we need zero or near to zero water for the plants apart from this supply.

TGIB1002

On the outside of the building the roof is coming along with a membrane layer applied to the roof, and now the start of the tin or “real” layer just going on. Later this week we hope to show you the sun tunes as they cut the holes and install them into the building.

TGIB1004

TGIB1007

The metal roof is actually being made on site, from rolls of metal. It will be a white roof to reflect the sunlight as much as possible.

TGIB1010

TGIB1012

TGIB1014

On the inside of the building they have started to put in the dry wall fittings and the office layout is beginning to take shape.

TGIB1017

Here is the main downstairs office area. You can see the shiny insulation material that is being put in which is fantastic.

TGIB1020

TGIB1021

This is the view down the central corridor from the main work space towards the studio space at the end.

TGIB1025

The showroom is starting to take shape – already starting to plan furniture layouts and so on.

TGIB1028

This is the kitchen area – looking through the wall!! Big enough for a table, chairs, fridge, microwave – great to grab a coffee and chill out for a bit rather than eating at your desk!!

TGIB1030

Detail on the insulation material – I am sure someone can tell me what all this means!!

TGIB1034

My office !!!!  ;-) ) not sure what I am going to be doing in there – seems huge !!

TGIB1038

Opposite is a smaller office area – not sure yet what or who is going in there..TBC…

TGIB1039

Upstairs we also have a bathroom with a shower area on the right. This is a big “green” factor as staff can now cycle to work etc etc

TGIB1041

The office space above the studio. This is turning into a really great space and the view out the windows will be awesome.

TGIB1044

The main upstairs space with my office far right, a storage space behind the guy with the ladder and the rest open plan….

TGIB1051

At the end I got a little arty !!

TGIB1056

So as always excited about the progress and the GREAT job that Projetech and the rest of the team are doing – cannot speak too highly of what they have done to date.

Similar Posts:

Post to Twitter Tweet This Post

2 Responses to “Inside and out progress report!”

  1. Wanda & Marshall says:

    Ciao….

    Looks great, sounds great. Any chance we can stay there when we come to visit…it seems so green and cooooool.
    Can’t wait to see your color schemes.

  2. Shara Bowen says:

    Truly Brilliant! Inspiring Green Building/ Renovating in the TCI

Leave a Reply