Only two months to go?? Will we be finished by Christmas??

The summertime always zips by so quickly and I cannot believe it’s been almost exactly a month since our last update. With the prospect of our green studio being ready at Christmas – we are basically only two months away from being “in” – woo hoo !! “Inconceivable!”

Projetech have been on the ball as always and have been relentlessly pushing to get things done on time and seem to be maintaining their “month ahead of schedule” projection for completion.

Yet another beautiful day in Turks and Caicos !

From the road the building is really looking smart with the roof now completed and exterior paint.

tgib09_0001

Close to the entrance they have started the curbing for the car parking area.

Next to the building itself we will have an electrical power point for a future electric vehicle.

tgib09_0002

The main entrance area with the signature staircase up to the second floor.

tgib09_0003

The downstairs working area where they were prepping the doors for the various office spaces and rooms.

tgib09_0005

Another view of the main entrance way. Note the large wall space on the right which will be awesome for displaying images…

tgib09_0007

The corridor that links the downstairs office area to the kitchen, the showroom and the presentation area.

tgib09_0008

The kitchen area. The far wall will have the energy-efficient fridge and microwave.

tgib09_0009

The studio space with excellent natural light.

tgib09_0010

Looking back down the main corridor. We were going to use the space on the right for storage, but I am loving it as a major display area!!

tgib09_0012

The showroom – looking a bit “blue” due to the protective tape 0n the windows!

tgib09_0013

Close up of the fabulous tile that is throughout the office – it has a very natural feel to it – almost wants you to walk barefoot everywhere!

tgib09_0014

The main upstairs workspace – looks great – love the natural light .

tgib09_0015

A solar tube towards the back of the main upstairs office space – this brings sunshine from outside right inside the building. The contractor likes these so much he is looking at putting them in his house!! GO GREEN !! PS it still needs the cover on it!

tgib09_0018

The rear office space with A/C in the middle and a solar tube top right and rear middle.

tgib09_0020

The view from the rear office towards the ocean and Grace Bay Club. We are literally less than 5 mins from all the major resorts.

tgib09_0021

Another view of the upstairs looking down towards the main entrance. The stairs and entrance area will be covered in a dark bamboo.

tgib09_0023

Finally the outside. Soon the containers will go and the car park area will be finished off.

tgib09_0027

So a lot has been done in the past month and only a few more weeks to go – really looking forward to it!

Similar Posts:

Post to Twitter Tweet This Post

One Response to “Only two months to go?? Will we be finished by Christmas??”

  1. Umar Khan says:

    Looks fantastic Andy, hope to see it finished on time. Beautiful place you live in…maybe I will pop over one day on my way to south America…….Umar